Create a Dimension
Introduction:
This procedure describes how a dimension definition is entered into OWB. Before this can be entered, it must be designed. Use this template to create the design, here is an example.
Aim:
Create a Dimension definition in OWB.
Requirements:
Access to an OWB Target Module.
Procedure:
- Log on to OWB.
- Open a project.
- Expand 'Databases'
- Expand 'Oracle'
- Expand the target module.
- Right-click 'Dimensions'
- -Create Dimension-
- Welcome:
- [Next]
- Name:
- Name: Paste this from the Definition section of the design.
- Prefix: This is buggy - leave blank.
- Description: Paste this from the Definition section of the design.
- Levels:
- For each Level described in the Definition section of the design:
- Name: Paste this from the Definition section of the design.
- Prefix: Paste this from the Definition section of the design.
- Description: Paste this from the Definition section of the design.
- [Add]
- [Next]
- Level Attributes:
- By default, each Level has the attribute; ID. This cannot - and should not - be removed.
- For each Level described in the Definition section of the design:
- Level: Use drop-down to select the Level to work with.
- For each Level Attribute described in the Definition section of the design:
- Name: Paste this from the Definition section of the design.
- Datatype: Enter the Datatype, Length, Precision & Scale as appropriate from the Definition.
- Description: Paste this from the Definition section of the design.
- [Add]
- [Next]
- Hierarchies:
- For each Hierarchy described in the Definition section of the design:
- Name: Paste this from the Definition section of the design.
- Prefix: Leave blank. OWB does nothing with this.
- Description: Paste this from the Definition section of the design.
- [Add]
- [Next]
- Level Relationships:
- For each Hierarchy described in the Definition section of the design:
- Hierarchy: Use drop-down to select the Hierarchy to work with.
- Select and transfer Levels from the left side to right side as per the Definition.
- [OK]
- Right-click the newly created dimension.
- -Validate...-
- This should result in the message; 'Validation completed successfully.'
0 Comments:
Post a Comment
<< Home